02/20/18 – Thermaltech meets with Mike Jackson and Tony Matre to discuss needs for code research for the existing access control system at building.
03/27/18 – ThermalTech to send Tony Matre a draft copy of the code research report by end of March for review.
04/25/18 – ThermalTech sent the report to Tony Matre. Study complete.