by TEI TEI

03/29/12 – SSRG completed test excavation with SSRG. Drain line not leaking. THP to review findings with Bert Watts. THP with support from SSRG plans to excavate and complete a test repair of gutter at drain line. THP to coordinate work with Darnell.

03/30/12 – THP Reviewed findings with Bert Watts. Water tests did not indicate the gutter or drain line was leaking; but transitions between the gutter and roof are leaking. In conjunction with the roof repairs, additional flashing repairs will be necessary during future projects.