12/09/20 – Fire pump and fire alarm are having multiple trouble signals (excessive amount). HCFD had SA Comunale investigate, and also JCI/Simplex, both stated that their systems are working correctly. TEI suggests that a logging meter be installed to determine if it is an incoming voltage issue to the fire pump since the alarm is a single phase alarm. Meter on pump and more data to follow once results from the metering are reviewed.
CH – Fire Pump Electrical Investigation
by MCB
by MCB MCB