Partner Lead: TEI
09/28/16 – TEI met with John Nester, Mike Jackson, and Coroner personnel re possible purchase of Mass Spectrometer machine to be located on the third floor of the existing Coroner’s office on Eden Avenue. TEI discussed methods and possibility to provide power to the machine. There was discussion of possibly providing opinions of probable cost for the installation and recommendations that country trades perform the installation. Bert has asked TEI to put cost together to install the equipment and location for equipment for THP to check weights.
10/11/16 – Cost estimates have been entered. John Nester provide email to Coroner’s staff outlining the procedure and cost.
12/29/16 – Awaiting direction from Owner on this and related projects.
02/22/17 – Awaiting direction from Owner on this and related projects.
07/27/17 – Project on hold. Waiting on word from owner on this project.
08/31/17 – No Updates. Archive this project.