12/07/07 – CRA schedule site visit 11/8/07. Compile existing drawings.
10/31/07 – CRA received the signed SOSS.
09/06/07 – CRA submitted the SOSS
12/07/07 – CRA schedule site visit 11/8/07. Compile existing drawings.
10/31/07 – CRA received the signed SOSS.
09/06/07 – CRA submitted the SOSS