111 – Arc Flash Model and Labeling

PM Rycca Thacker, Mike Barth

06/23/26 – DEG receives PO and signed SOSS. Arc Flash Study initiated.
07/29/26 – DEG has nearly the entire single line from the KZF project modeled in SKM software. Next step is to field verify make/model numbers and serial numbers. DEG to schedule with the building manager.
08/26/26 – Study in progress.
09/23/26 – Study progress continues.
10/28/26 – Study complete. Labels to be printed and be scheduled with building manager to apply.