ACTIVE PROJECTS
- 111 – Arc Flash Model and Labeling
- 111 – Employee Break Shelter (No ITB)
- 111 – Retention Pond Repair
- 2020 – ATS Replacement
- 2020 – Emergency Gear Upgrade Replacement
- 2020 – Roof Replacement (F034) and Davit Upgrade (F027)
- 2027 Project Cost Estimates
- 230 – 10th Floor Marriage License Reno 2024
- 230 – 11th Flr Training Rm Acoustics
- 230 – East Exterior Lighting
- 230 – Elevator Modernization
- 230 – Fire Door Repairs
- 230 – Lobby Security Upgrades
- 230 – Plumbing Upgrades
- 525 – EMA/JFS/513 Office Renovations
- 525 – HVAC Retrocommissioning (No ITB)
- 525 – Warehouse Doors and Ramp (F072)
- 800 – 6th Floor Reno & Bsmt Plumbing Repairs
- 800 – Arc Flash Mitigation 2023
- 800 – Elevator Modernization
- 800 – Evac Plans
- 800 – Exit Stair Security Cages
- 800 – Façade Repair SD (F022)
- 800 – Fire Alarm System Upgrade
- 800 – Fire Door Repairs
- 800 – Fire Pump Replacement
- 800 – HVAC Controls Upgrade (STS)
- 800 – Low Rise AHU Replacements
- 800 – Probation EMU Office Expansion
- 800 – Tower AHU Replacements
- All Buildings – Emergency Switchgear PM
- All Buildings – Fire Damper Testing & Inspection
- All Buildings – Life Safety Drawings
- All Buildings – Space Allocation Drawings
- Archibus
- Burlington – Engineer Renovation
- Central – DDS Renovation
- Central – Office Consolidation Phase 1 & 2
- Central – UPS Upgrade
- CH – 6th Floor Sheriff’s Storage
- CH – B95 Office Suite Renovations
- CH – Bronze Door Repair
- CH – Common Pleas AV Upgrades
- CH – Elevator Modernization
- CH – Facade Repairs/Roof Replacement (F005)
- CH – Fire Door Repairs
- CH – HVAC Control System Replacement (081-22)
- CH – Law Library Stained Glass Window Repair
- CH – Law Library Text Room Renovation
- CH – North and South Riot Door Refurbishment
- CH – Parking Lot Repair (F029)
- CH – Parking Lot Security
- Champlin – General Services
- Colerain – Animal Shelter – (F037)
- Colerain – Kitty City Electrical Upgrades
- Comm Center – Electrical Assessment
- Comm Center – Electrical Device ID and Arc Flash
- Crime Lab – Full Electrical Coordination Study
- Dane – Security System and Exterior Lighting
- Elevar – General Services 2025 (F021)
- EMA – Tornado Siren Conditions Assessment (No ITB)
- EMA – Tornado Sirens Arc Flash Study
- EMA – Tornado Sirens Gen Services 2024
- Energy Manager
- Hillcrest – Campus Long Term Strategic & Master Planning
- Hillcrest – Campus Repairs Phase 1
- Hillcrest – Fire Alarm System Fiber Connectivity
- JC – 2022 Cell Door Replacement (Ph 2 Triton)
- JC – Cell Door and Frame Replacement (Phase 5)
- JC – Cell Door Lock Replacement (Cornerstone)
- JC – Condenser Pumps Replacement
- JC – Door Phase 6
- JC – Emergency Power Upgrade 2025
- JC – Fire Alarm System Upgrades
- JC – Fire Door Repairs
- JC – Fire Pump Replacement (085-24)
- JC – LC Server Rack Upgrades 2023
- JC – Lobby Ceiling Replacements
- JC – Polished Concrete – Phase 2
- JC – Selective Cell Door Replacement 2023 (Ph 3 Cornerstone)
- JC – Selective Cell Door Replacement 2024 (Ph. 4)
- JC – Server Room Access Control Upgrades 2023
- Master Planning 2019
- RSC – City Water Main Extension
- RSC – Regional Safety Complex Phase 2
- SPHQ – Arc Flash Remediation 2024
- SPHQ – Fall Protection Upgrade (F026)
- TEI – General Services
- TPC – 3rd Floor Auditor Breakroom
- TPC – 8th FL Planning & Development
- TPC – Atrium Glass Replacement
- TPC – BOCC Security Upgrades
- TPC – Mechanical Room Door Replacement
- TPC – NFPA Fire Door Upgrades
- TPC – Reentry Expansion
- TPC 9th Floor JFS and CoC Renovation
- Winton – New Animal Shelter Building