Hamilton County Facilities

Colerain – Animal Shelter Wood Canopy (F020)

PM: John Nester, John Millar
10/21/24 – HC reached out to THP asking for repair of the Animal Shelter Wood Canopy.
10/31/24 – THP reviewed internal past documents and County email. THP to meet with County to discuss next steps.
12/11/24 – THP working on repair design.
12/16/24 – THP surveyed the site and met with County personnel. Shoring configuration was discussed and direction was given to install preliminary shoring.
12/17/24 – THP sent shoring detail for review.
12/19/24 – HC installed shoring and sent photos of sample shores. Shoring detailing was confirmed.

Scroll to Top