01/22/18 – Hamilton County requested an SOSS
01/30/18 – THP contacted City and reviewed building configuration with the City. A façade inspection is not noted required. THP published the email train with the city to the County.
01/22/18 – Hamilton County requested an SOSS
01/30/18 – THP contacted City and reviewed building configuration with the City. A façade inspection is not noted required. THP published the email train with the city to the County.