NFPA 80 Fire Door Service Agreement
11/16/2018 – Facilities contacts GBBN about authoring an SOSS for this project.
11/23/2018 – GBBN issues and delivers SOSS to Facilities.
NFPA 80 Fire Door Service Agreement Read More »
General Services – GBBN
Archive
11/16/2018 – Facilities contacts GBBN about authoring an SOSS for this project.
11/23/2018 – GBBN issues and delivers SOSS to Facilities.
NFPA 80 Fire Door Service Agreement Read More »
11/16/2018 – Facilities contacts GBBN about authoring an SOSS for this project.
11/23/2018 – GBBN issues and delivers SOSS to Facilities.
NFPA 80 Fire Doors- Outlying Buildings Read More »
09/13/18 – Facilities requests GBBN/In4 to author a SOSS for General CAD related items that may happen as Facilities is migrating the Space Module to Web Central.
10/22/18 – Facilities requests status on project. GBBN responds indicating intentions to mobilize by 10/25/18.
05/22/19 – GBBN isssues updated drawings for Facilities related to WebCentral new updates to the system.
02/26/20 – Facilities is finalizing the Space migration/ARCHIBUS v24 project, hopefully by next month. The Facilities Department is in need of some tweaks to the published drawings in the UAT site:
https://hamiltonuat.asset-fm.com/archibus/
Steve Farashian is the new Facilities PM for the project and he will be going to contact GBBN regarding those tweaks.
GBBN – CAFM CAD General Maintenance Read More »
05/15/18 – Jack Randall and In4 meet with Facilities to discuss Web Central Drawing Publishing. In4 is requested to begin SOSS process.
05/15/18 – GBBN creates internal Opportunity and Network File Structure.
05/30/18 – In4 drafting SOSS to be submitted to Facilities by 06/01/18.
06/25/18 – SOSS is approved and delivered to GBBN by Facilities.
08/25/18 – In4 makes first push of publishing to the Web Central Website.
08/29/18 – In4 is completed with uploading to Web Central. Facilities is performing a quality check on drawings that have been uploaded.
08/28/19 – GBBN continues to update percentage of line weights for publishing to WebCentral. No other updates at this point from the Owner.
09/24/19 – IN4 indicated Purchase Order and Invoice reviews are underway to clarify remaining balance on Purchase Order for this project. No other feedback from Owner related to uploading process.
02/26/20 – Facilities is finalizing the Space migration/ARCHIBUS v24 project, hopefully by next month. The Facilities Department is in need of some tweaks to the published drawings in the UAT site:
https://hamiltonuat.asset-fm.com/archibus/
Steve Farashian is the new Facilities PM for the project and he will be going to contact GBBN regarding those tweaks.
03/26/20 – GBBN is working with ThermalTech to derive and estimating method for editing the website for As-Builts during an ongoing project.
GBBN – In4- Web Central Drawing Publishing Read More »
04/30/18 – Facilities sends final listing of 2019 Project Request Estimates to GBBN.
05/02/18 – IPM sends SOSS input to GBBN.
05/03/18 – GBBN delivers SOSS to Facilities.
05/11/18 – GBBN receives SOSS and Purchase Order from Facilities.
05/14/18 – IPM begins User Group interviews on appropriate Estimate Requests.
05/30/18 – GBBN meets with JCC Building Manager and Sheriff’s Office to discuss Estimate #1953 on overhead door replacement.
06/12/18 – GBBN meets with the CAB Auto Title Department about Employee Restroom Estimate Request.
06/13/18 – GBBN meets with Rick Hoffman and Greg Brufh about the estimate request for the Courthouse Room #315.
06/18/18 – GBBN holds telephone conversation with Electric Power Doors, the original installer and manufacturer of the four-fold hydraulic doors.
06/19/18 – GBBN holds telephone conversation with Overhead Doors of Cincinnati, the current maintenance contract holder.
06/20/18 – GBBN requests information and pricing from Pinnacle Engineering related to ACM abatement scope of work.
06/25/18 – GBBN receives Security Glazing input from Tony Matre and Geiger Construction Products. Sheriff confirms overhead and four-fold hydraulic doors are not required to be ballistic rated.
06/26/18 – TEI has finished fieldwork on all cost estimate. Vendor quotes have been received where needed and coordination with partners has been an ongoing process. Most estimates are entered and ready for final review by TTC and MB. we are shooting to be complete by the end of June on this project.
06/26/18 – GBBN receives estimating input from the four-fold hydraulic door vendor.
07/06/18 – GBBN completes all estimating and reports the same to Facilities.
All Buildings – 2019 Project Request Estimating Read More »
07/16/18 – Facilities emails listing of 318 Project Request Estimates. Request is made for SOSS for the Binder Assembly
07/24/18 – Facilities confirms final count of Estimates, number of Binders and delivery date of binders to Facilities.
07/25/18 – GBBN submits SOSS to Facilities.
08/02/18 – GBBN receives approved SOSS from Facilities.
10/22/18 – GBBN is completed with all Project Request Estimating printing.
01/29/19 – GBBN recieves Facilities final binder Summary Files for printing.
02/08/19 – GBBN transfers empty binders from Courthouse to GBBN.
02/14/19 – GBBN bundles entire printing files, on CD, along with empty binders, and past years’ binders for pick-up by ARC Reprographics.
All Buildings- 2019 Project Request Estimating- Binder Assembly Read More »
04/19/18 – Kevin Maue contacts GBBN about a Kick-off Meeting to discuss and view the scope of work for this project.
04/20/18 – GBBN solicits input on pricing and workload from Kingsley Contractor. Data is shared with DDS.
04/27/18 – GBBN to meet with Kevin Maue of DDS to hold Kick-off Meeting.
DDS- Rost and Franks Repaving Project Read More »
11/11/18 – GBBN contacted by Director of Operations to review potential two Kitchen Epoxy Floor Replacements. Projects to be constructed by 3/318.
1/11/18 – GBBN contacts manufacturer to inquire about existing product that has begun to fail and preparation required to recoat.
1/21/18 – Samples of colors and slip resistance sent to Operations for selection by Owner.
1/23/18 – Owner color and slip resistance level selections presented to GBBN.
2/1/18- Pre-Bid meeting held at GABP. Three attendees present. RFP documents distributed.
2/3/18 – Addenda #1 distributed.
2/12/18- All three proposals received. GBBN contacts low and responsible bidder to verify scope. GBBN recommends J Wesselman Specialty Flooring, LLC to Owner.
02/19/18 – Contractor to commence work at GABP. Background Checks required by Reds.
GABP- Diamond Club Kitchen Epoxy Floor Read More »
06/25/14 – Facilities contacts GBBN about project and requests SOSS to be created.
07/02/14 – GBBN issued SOSS to Facilities.
02/26/15 – Mt. Airy project officially cancelled effectively cancelling this project.
B.I.M. STANDARDS GBBN Read More »
10/20/11 – Kick-off Meeting with Pinnacle and Facilities Department
11/04/11 – Facilities Department sends list of buildings to be included in Asbestos Abatement Reporting.
02/14/12 – Pinnacle Engineering requested drawing files for the purpose of documenting findings.
02/15/12 – GBBN sent drawing files to Pinnacle Engineering in PDF form.
03/30/12 – Meeting with Tim Schue of Facilities Department to discuss Archibus Input Strategy
04/03/12 – Field work completed, draft report completed and ready for initial review.
04/05/12 – Meeting with GBBN and Facilities to discuss drawing format.
05/10/12 – Meeting with GBBN and Pinnacle to discuss drawing format for reports. Tony Matre’s request for ‘General Information Notes to occur on each floor plan are discussed.
10/27/12 – Pinnacle Engineering sent ACM list from Archibus/BRG for purposes of designation conversion from Pinnacle report to Archibus data entry.
01/26/13 – BRG confirms entry of ACM data into Archibus is completed.
01/28/13 – GBBN conducts spot review and confirms data entry is accurate.
02/28/13 – Pinnacle sends GBBN a proposed completion schedule for remaining work.
03/18/13 – Tony Matre calls GBBN to request a status check on Pinnacle’s delivery schedule.
04/05/13 – Email sent to Pinnacle Engineering inquiring about status of project reports and unmet schedule milestone goes without response.
04/20/13 – Email sent to Pinnacle Engineering inquiring about status of project reports and unmet schedule milestone goes without response. Reported to Tony Matre via telephone call.
02/24/14 – GBBN and Pinnacle Engineering met with Tony Matre to deliver the final reports and electronic copies of the reports. GBBN is completing final report drawings for Pinnacle as final preliminary drawings are delivered by Pinnacle to GBBN. All drawings are to be completed by 2/28/14.
03/26/14 – All asbestos reports and associated drawings are complete. Final drawing input into Archibus/Web Central is ongoing. GBBN was granted access to the database to complete the drawing downloads.
07/01/14- GBBN sends another email and follow-up voice mail to Pinnacle Engineering inquiring about status of billings and final completion.
08/29/14- Pinnacle Engineering sends invoices for services to GBBN.
10/29/14 – GBBN sends Tony Matre SOSS invoice status with all of the Pinnacle Engineering invoices included.
10/31/14 – GBBN pursuant to Tony Matre’s request sends letter of documentation regarding scope overruns.
02/20/15 – GBBN in communications with Tony Matre to finalize invoicing for these projects.
ROUND BOTTOM GARAGE Asbestos Study Read More »
03/30/12 – Meeting with Tim Schuh of Facilities Department to discuss Archibus Input Strategy
04/05/12 – Meeting with GBBN and Facilities to discuss drawing format.
05/04/12 – GBBN receives drawing files from C-R Architecture upon request for use by Pinnacle.
05/07/12 – GBBN transmits drawing files to Pinnacle for use in field documentation.
05/10/12 – Meeting with GBBN and Pinnacle to discuss drawing format for reports. Tony Matre’s request for ‘General Information Notes to occur on each floor plan are discussed.
10/27/12 – Pinnacle Engineering sent ACM list from Archibus/BRG for purposes of designation conversion from Pinnacle report to Archibus data entry.
12/22/12 – GBBN sends request to Pinnacle Engineering for remaining ACM translation data for continued Archibus data entry.
02/26/13 – GBBN inquires with Pinnacle for status of remaining documents to be sent to GBBN.
02/27/13 – Pinnacle reports back that progress has been made and further timetable for receipt will be coming 2/28/13
02/28/13 – Pinnacle sends GBBN a proposed completion schedule for remaining work.
03/18/13 – Tony Matre calls GBBN to request a status check on Pinnacle’s delivery schedule.
04/05/13 – Email sent to Pinnacle Engineering inquiring about status of project reports and unmet schedule milestone goes without response.
04/20/13 – Email sent to Pinnacle Engineering inquiring about status of project reports and unmet schedule milestone goes without response. Reported to Tony Matre via telephone call.
0611/13 – GBBN receives floor plan updates in electronic form. GBBN updates CAFM drawings for the 1916 for future reference.
02/24/14 – GBBN and Pinnacle Engineering met with Tony Matre to deliver the final reports and electronic copies of the reports. GBBN is completing final report drawings for Pinnacle as final preliminary drawings are delivered by Pinnacle to GBBN. All drawings are to be completed by 2/28/14.
03/26/14 – All asbestos reports and associated drawings are complete. Final drawing input into Archibus/WebCentral is ongoing. GBBN was granted access to the database to complete the drawing downloads. No existing drawing of 1916 Central Parkway exists in Archibus. GBBN to visit site and do field ottom: 2px”>
02/20/15 – GBBN in communications with Tony Matre to finalize invoicing for these projects.
RECORD CENTER Asbestos Study Read More »
10/20/11 – Kick-off Meeting with Pinnacle and Facilities Department
11/04/11 – Facilities Department sends list of buildings to be included in Asbestos Abatement Reporting.
03/30/12 – Pinnacle Engineering requested drawing files for the purpose of documenting findings.
03/31/12 – GBBN sent drawing files to Pinnacle Engineering in pdf form.
03/30/12 – Meeting with Tim Schue of Facilities Department to discuss Archibus Input Strategy
04/03/12 – Field work completed, draft report completed and ready for initial review.
04/05/12 – Meeting with GBBN and Facilities to discuss drawing format.
05/10/12 – Meeting with GBBN and Pinnacle to discuss drawing format for reports. Tony Matre’s request for ‘General Information Notes to occur on each floor plan are discussed.
10/27/12 – Pinnacle Engineering sent ACM list from Archibus/BRG for purposes of designation conversion from Pinnacle report to Archibus data entry.
01/26/13 – BRG confirms entry of ACM data into Archibus is completed.
01/28/13 – GBBN conducts spot review and confirms data entry is accurate.
02/28/13 – Pinnacle sends GBBN a proposed completion schedule for remaining work.
03/18/13 – Tony Matre calls GBBN to request a status check on Pinnacle’s delivery schedule.
04/05/13 – Email sent to Pinnacle Engineering inquiring about status of project reports and unmet schedule milestone goes without response.
04/20/13 – Email sent to Pinnacle Engineering inquiring about status of project reports and unmet schedule milestone goes without response. Reported to Tony Matre via telephone call.
06/10/13 – Pinnacle Engineering response with email indicating CAB report will arrive 06/11/13 and CAB on 06/14/13.
06/14/13 – Galbraith Road Garage Report arrives from Pinnacle. CAB report is not included.
02/24/14 – GBBN and Pinnacle Engineering met with Tony Matre to deliver the final reports and electronic copies of the reports. GBBN is completing final report drawings for Pinnacle as final preliminary drawings are delivered by Pinnacle to GBBN. All drawings are to be completed by 2/28/14.
03/26/14 – All asbestos reports and associated drawings are complete. Final drawing input into Archibus/WebCentral is ongoing. GBBN was granted access to the database to complete the drawing downloads.
07/01/14 – GBBN sends another emial and follow-up voice mail to Pinnacle Engineering inquiring about status of billings and final completion.
08/29/14 – Pinnacle Engineering sends invoices for services to GBBN.
10/29/14 – GBBN sends Tony Matre SOSS invoice status with all of the Pinnacle Engineering invoices included.
10/31/14 – GBBN pursuant to Tony Matre’s request sends letter of documentation regarding scope overruns.
02/20/15 – GBBN in communications with Tony Matre to finalize invoicing for these projects.
GALBRAITH RD GARAGE Asbestos Study Read More »
10/20/11 – Kick-off Meeting with Pinnacle and Facilities Department
11/04/11 – Facilities Department sends list of buildings to be included in Asbestos Abatement Reporting.
02/23/12 – Pinnacle Engineering requested drawing files for the purpose of documenting findings.
02/24/12 – GBBN sent drawing files to Pinnacle Engineering in pdf form.
02/24/12 – Pinnacle began field investigation at the site.
03/30/12 – Meeting with Tim Schue of Facilities Department to discuss Archibus Input Strategy
04/03/12 – Field work completed, draft report completed and ready for initial review.
04/05/12 – Meeting with GBBN and Facilities to discuss drawing format.
05/10/12 – Meeting with GBBN and Pinnacle to discuss drawing format for reports. Tony Matre’s request for ‘General Information Notes to occur on each floor plan are discussed.
10/27/12 – Pinnacle Engineering sent ACM list from Archibus/BRG for purposes of designation conversion from Pinnacle report to Archibus data entry.
01/26/13 – BRG confirms entry of ACM data into Archibus is completed.
01/28/13 – GBBN conducts spot review and confirms data entry is accurate.
02/28/13 – Pinnacle sends GBBN a proposed completion schedule for remaining work.
03/18/13 – Tony Matre calls GBBN to request a status check on Pinnacle’s delivery schedule.
04/05/13 – Email sent to Pinnacle Engineering inquiring about status of project reports and unmet schedule milestone goes without response.
04/20/13 – Email sent to Pinnacle Engineering inquiring about status of project reports and unmet schedule milestone goes without response. Reported to Tony Matre via telephone call.
06/09/13 – GBBN inquires with Pinnacle Engineering about delays in deliverables.
02/24/14- GBBN and Pinnacle Engineering met with Tony Matre to deliver the final reports and electronic copies of the reports. GBBN is completing final report drawings for Pinnacle as final preliminary drawings are delivered by Pinnacle to GBBN. All drawings are to be completed by 2/28/14.
03/26/14 – All asbestos reports and associated drawings are complete. Final drawing input into Archibus/WebCentral is ongoing. GBBN was granted access to the database to complete the drawing downloads.
07/01/14 – GBBN sends another emial and follow-up voice mail to Pinnacle Engineering inquiring about status of billings and final completion.
08/29/14 – Pinnacle Engineering sends invoices for services to GBBN.
10/29/14 – GBBN sends Tony Matre SOSS invoice status with all of the Pinnacle Engineering invoices included.
10/31/14 – GBBN pursuant to Tony Matre’s request sends letter of documentation regarding scope overruns.
02/20/15 – GBBN in communications with Tony Matre to finalize invoicing for these projects.
RIPPLE RD GARAGE Asbestos Study Read More »
07/01/14 – GBBN sends another emial and follow-up voice mail to Pinnacle Engineering inquiring about status of billings and final completion.
08/29/14 – Pinnacle Engineering sends invoices for services to GBBN.
10/29/14 – GBBN sends Tony Matre SOSS invoice status with all of the Pinnacle Engineering invoices included.
10/31/14 – GBBN pursuant to Tony Matre’s request sends letter of documentation regarding scope overruns.
02/20/15 – GBBN in communications with Tony Matre to finalize invoicing for these projects.
1916 CENTRAL PARKWAY Asbestos Study Read More »
09/17/13 – Bert Watts requests Partners to submit SOSS for 2014 General Services.
09/18/13 – SOSS submitted to Bert Watts.
01/30/14 – GBBN attends monthly Partnering Meeting.
02/27/14 – GBBN attends monthly Partnering Meeting.
02/24/14 – Bert Watts indicates the JCC Mural project services will be billed to the General Services.
02/25/14 – GBBN and TEI meet with Bert Watts to discuss moving the Recorder’s File Storage to the CAB 10th Floor CLEAR area. Bert requests the services for the Schematic Design and Opinion of Probable Costs be billed to the General Services.
03/18/14 – GBBN delivers estimating binders to Facilities after review finds all printing and assembly of binders to be in order.
04/24/14 – GBBN attends monthly Partnering Meeting.
03/27/14 – GBBN gets new Partner ID Badge at Sheriff’s Office in Courthouse to replace lost badge.
04/24/14 – GBBN attends monthly Partnering Meeting.
05/29/14 – GBBN attends monthly Partnering Meeting.
06/23/14 – GBBN completes the CAB 8th Floor As-Built drawing layering standard review and reconciliation.
06/26/14 – GBBN attends monthly Partnering Meeting.
07/28/14- Facilites sends Master Service Agreement Admendment to GBBN for signatures.
07/28/14- Facilities sends three building (230 WHT Law Center/CAB Basement/A&D) existing As-Built drawings to GBBN for layering verification review.
07/31/14- GBBN attends monthly Partnering Meeting and delivers signed Master Service Agreement Admendment to Facilities.
09/02/14- Bert Watts contacts GBBN about a project to renovate an existing space in 800 Broadway, 6th Floor.
09/05/14- Sketch sent from Bert Watts about pop-up project at 800 Broadway.
09/15/14- GBBN attends kick-off meeting with Bert Watts, JFS and Juvenile Court.
09/16/14- ThermalTech sends the MEP Estimating Documents to GBBN. GBBN sends combined project Estimate to Bert Watts for review.
09/30/14- GBBN receives email invitation to visit Patrol Headquarters to investigate addition for a Kennel and to investigate an operable partition renovation to the Comm. Center.
10/16/14- GBBN receives email with Operable Partition quote, developed by OKI (7/7/14), from Bert Watts via John Nester.
10/07/14- GBBN receives email from Bert Watts about estimate project requests created in Archibus for estimating.
10/09/14- GBBN sends first iteration of Patrol Headquarters Kennel addition floor plan to Facilities and TEI for review.
10/15/14- GBBN completes estimate for Patrol Headquarters Kennel addition.
10/16/14- GBBN receives comments and suggested floor plan revisions for the Patrol Headquarters Kennel estimate.
10/17/14- GBBN contacts Metallic Building Systems about Burlington Garage siding repairs by email off the link from the website.
10/20/14- GBBN sends updated Patrol Headquarters Kennel floor plan to TEI and Facilities for review and estimating.
10/20/14- GBBN sends deflection criteria information to THP to review for roof joist loading. Structural drawings received from TEI are forwarded to THP for investigation.
10/24/14- GBBN contacts Metallic Building Systems about Burlington Garage siding repairs by telephone. Voice mail was left.
10/27/14- GBBN receives call from Valcom Enterprises related to inquiry about floor mounted operable partition system. Telephone memo forwarded from GBBN to Facilities and THP.
10/29/14- Bert Watts forwards final design criteria on Comm. Center operable partition for estimating (three separate estimating options) purposes. GBBN calls Valcom Enterprises for quotation on actual floor mounted operable partition.
10/30/14 – GBBN attends monthly partnering meeting. Next Meeting scheduled for January 2015 if GBBN awarded contract extension.
2014 GENERAL SERVICES GBBN Read More »
Preliminary tests indicate mold is present, but no asbestos.
October 12 field work completed for building assessment.
Past Comments
THP anticipates field work week of October 10th.
September 16, 2011 SOSS approved.
September 8, 2011 THP Submitted SOSS for review.
Sheriff Target Range Building Envelope Assessment Read More »
2/9/10-Meeting with Bert Watts at Community Development
2/18/10- Issued SOSS to Bert Watts.
2/19/10-Bert questioned GBBN verses TEI scope and permitting costs.
2/22/10-Terry Cannon of TEI issued email with scope, SOSS and permitting resolutions.
3/6/10- Received signed SOSS.
3/8/10- Met with Mike Florimonte to field measure adjacent storage space. Receive directive to eliminate one workstation for a total of 3. The fourth area to become storage.
3/15/10-Received Purchase Order (538771) from Bert Watts.
3/17/10-Susan Walsh approved rotated third workstation.
3/31/10-Final Design Development drawings submitted to Bert Watts for Susan Walsh’s review.
4/6/10- Building Permit Application, Drawings, Electronic Submittal and Check delivered to Cincinnati Buildings and Inspections.
4/21/10- Approved Building Permit paid for and picked-up from Cincinnati Buildings and Inspections.
4/22/10- Approved Permit and Drawings Delivered to Bert Watts.
5/18/10- Inspector Larry Keifer has requested an additional sprinkler head be added in the expansion space.
6/24/10- Sprinkler permit has been filed and still pending.
7/29/10- Bert Watts declared this project closed and ready for Archives.
CAB 10th Floor Community Development Expansion Read More »
01/29/15 – County requested THP review the Match House walls.
02/23/15 – THP sent email with general recommendations and an opinion of probable cost.
02/24/15 – County requested a full letter report and authorized additional field work.
03/26/15 – THP anticipates publishing the final letter report.
03/26/15 – THP published final letter report.
SHERIFF TARGET RANGE Match House Investigation Read More »
Lead Partner: GBBN
08/17/16 – Facilities confirms GBBN has no As-Built scope for this project on the SOSS.
08/18/16 – GBBN discusses <30% existing structure addition requirement for full existing building structural analysis. GBBN reports findings to Facilities.
08/22/16 – GBBN gets SOSS scope from TEI for Electrical scope of work. Hard copies delivered in the mail.
08/23/16 – GBBN consults with THP to discuss structural SOSS and permitting requirements for the project.
08/24/16 – GBBN forwards contact information from original contractor of Pole Barn Shed for investigation into alternative delivery method.
Burlington Garage Storage Shed Expansion Read More »
11/10/16 – GBBN is contacted by Facilities to arrange a meeting to discuss a new SOSS and project.
11/13/16 – GBBN authors SOSS and delivers to Facilities.
03/22/18 – Facilities initiates GBBN to begin using this approved SOSS for field verification at 230 WHT Law Center.
04/02/18 – GBBN confirms Facilities contact for initiating the field verification at 230 Law Center.
04/20/18 – 800 Broadway First Floor corrected drawing files were updated and uploaded to the website.
06/25/18 – GBBN files to be updated are attached to email to Facilities for the CAB 10th Floor West Suite. GBBN makes repost and sends CAFM drawings to Facilities.
07/18/18 – GBBN visits 230 WHT Law Center to begin filed verification.
07/19/18 – GBBN revisits 230 WHT Law Center to finish field verification of locked spaces and rooms not accessible the day before.
08/02/18 – Facilities indicates the preferred final order of last two buildings to be field verified and uploaded. The Courthouse is to follow the 230 Law Center.
08/27/18 – John Gilbert, Building Manager, confirms all of the GBBN Departmental Allocations are correct.
08/28/18 – GBBN uploads updated drawings to website.
09/25/18 – GBBN and Facilities communicate about field verification scope for the Justice Center. GBBN will field verify the Justice Center immediately following the Courthouse.
09/5/18 – GBBN emails Building Manager to request escort in building to begin field verification tours of the Courthouse.
09/25/18 – Facilities and GBBN exchange information to document the scope of field verification at the Justice Center Buildings.
10/18/18 – GBBN sends updated Courthouse Departmental drawings to Owner for review.
10/22/18 – Facilities and GBBN discuss scope involving AED and First Aid Kit documentation and review by Owner.
11/28/18 – GBBN to meet with Building Manager today to begin field verification efforts.
12/11/19 – Courthouse 6th floor numbering/room name conflicts are resolved.
12/18/19 – Parking lot updates to theBasement and exterior parking areas are completed.
01/11/19 – GBBN sends Departmental updated drawings to Facilites. Facilities confirms override completed.
01/14/19 – GBBN sends electronic deparmental and architectural drawing updates to Facilities for overriding of existing files.
01/15/19 – Courthouse updated plans in pdf are transmitted from GBBN to Facilities.
01/31/19 – Facilities requests additional outbuildings to be field verified. Building Manager contact information is shared.
07/05/19 – GBBN electronically transfers Updated Field Verified drawings to Facilities for 230 WHT, 800 Broadway, Courthouse and the Justice Center.
08/06/19 – GBBN meets Mike Jackson to field verify 250 WWHT, 264 WHT and 2611 Highland. GBBN confirms with othe Partners that no existing electronic drawing files exist for 2611 Highlands Ave.
08/15/19 – GBBN informs Facilities that Courthouse Room #205 Architectural updates/As-Builts have been completed. MEP updates need to be completed at this time. Facilities suggests waiting until the CAB, 9th Floor Computer Room scope of work has been completed with the Server Room project.
09/24/19 – GBBN only has 2020 Auburn to field verify and document any updates. Contact with Bill Scholl has not be initiated as of yet.
11/21/19 – GBBN meets with Bill Scholl, Building Manager at 2020 Auburn, to walk the building and perform field verification.
12/20/19 – GBBN sends revised Evacuation plans for 2020 Auburn to Facilities.
12/23/19 – Facilities indicates GBBN should renew County access badge to staff working on this project since existing badge is expired.
01/30/20 – Facilities confirms receipt of 2020 Auburn Wayfinding Sign transmission. Pushing to WebCentral to occur in near future.
03/26/20 – GBBN is working with ThermalTech to derive and estimating method for editing the website for As-Builts during an ongoing project.
GBBN – 2018 Space Allocation – Drawing Updates Read More »
01/27/17 – Hamilton County requested SOSS.
03/02/17 – THP provided Hamilton County with a SOSS.
04/03/17 – GBBN meets with Facilities to review existing building drawing and specification documents.
04/20/17 – SOSS approved and delivered along with Purchase Orders.
09/13/17 – GBBN begins on this project and drawing research commences.
03/09/18 – Facilities transmits additional documents for the fire door ratings, including original construction documents, submittals and Door Schedules.
03/11/18 – GBBN sends first building inventory compilation to Facilities for review. Facilities recommends door totals along the bottom of the inventory for simplicity.
03/18/18 – GBBN completes 5 of 6 building Inventories. Justice Center is to be completed once Facilities locates original construction documents.
04/11/18 – Facilities confirms all sources for original construction drawing Door Schedule or Life Safety Drawing have completed without success in finding any. GBBN is instructed to complete the Justice Center listing using their best professional judgment on fire door locations.
07/11/18 – Facilities confirms only swinging doors are to be included in listings. Also confirms the Alternate Bids from original construction that were accepted.
07/13/18 – All six (6) final reports for existing fire rated doors is sent to Facilities.
07/16/18 – Facilities confirms the scope of work has been completed.
GBBN – Campus Buildings – NFPA 80 Fire Doors Read More »
12/12/16 – GBBN is contacted by Facilities to arrange a meeting to discuss a new SOSS and project.
12/13/16 – GBBN authors SOSS and delivers to Facilities.
12/20/16 – GBBN receives approved SOSS.
01/26/17 – Bert says they will have to go into each building and look for building changes and update these onto the CAFM Archibus changes.
03/21/17 – GBBN and In4 meet with Facilities to discuss next step and phase of this project related to the County Administration Building.
03/31/17 – GBBN meets with John Gilbert to begin Field Verification of CAB all floors.
04/10/17 – GBBN transmits updated drawings to Facilities for purpose of mark-ups of Departmental Allocations.
06/15/17 – GBBN meets with Building Management to walk entire building and perform field verification at 800 Broadway.
08/18/17 – GBBN re-ran hatch pattern software on each CAB Floor Plan from CAFM. Adjusted plans were sent to Facilities.
08/23/17 – GBBN forwards to Risk Management Safety Department the GBBN modified Alms & Doepke Life Safety Plans for internal review.
08/24/17 – Risk Management Safety Department approves GBBN modified Alms & Doepke Life Safety Plans.
08/25/17 – CAB Chargeable Area issues discussed with GBBN/In4. Review of the CAB Plans were run and a discussion about Pro-Rated Areas and Space Managers commenced.
08/28/17 – GBBN / In4 responded about Chargeable Areas with updated Pro-Rated documents for Facilities’ Review.
09/15/17 – Tim Schuh, of Facilities, reports back that “Update Area Totals” are only run when the drawings are updated.
02/16/18 – Facilities sends email requesting 800 Broadway Life Safety and Departmental Allocation drawings be printed in pdf and sent to Facilities. Also A&D Departmental Allocations Drawings.
02/20/18 – GBBN sends all requested pdf files to Facilities.
02/21/18 – Facilities requests additional Chargeable Area revisions to the 800 Broadway Sub-Basement, 1st, 2nd, 4th, 6th, 17th and 18th Floor Space Allocation Plans.
02/21/18 – Facilities requests all of the County Administration Space Plans be revisited for consistency in Chargeable Area verses Room Area Breakdowns.
02/22/18- GBBN sends 800 Broadway 17/18th Floor plan updates to Facilities.
03/21/128 – GBBN completes updates to all 800 Broadway on IFM.
03/22/18 – GBBN uploads 17/18th Floor updates to IFM with modifications to updated Departmental Allocations.
GBBN – Space Allocation – Drawing Updates Read More »
12/12/16 – GBBN is contacted by Facilities to arrange a meeting to discuss a new SOSS and project.
12/13/16 – GBBN authors SOSS and delivers to Facilities.
12/20/16 – GBBN receives approved SOSS.
GBBN – Feasibility Planning and Drawing Updates Read More »
Partner Lead: GBBN
10/11/16 – GBBN is contacted by Facilities to arrange a meeting to discuss a new SOSS and project.
10/13/16 – IPM and GBBN and ThermalTech hold meeting with Facilities to discuss new SOSS. New project is to design a prototype single-sex/Family restroom to be added new or a renovation of an existing restroom for use by the public. Intent is to determine any existing code requirements affecting this need and locations for them.
10/18/16 – ThermalTech sends proposed labor hours for MEP to GBBN.
01/26/17 – Study can be started with the goal of creating a unit box cost for creating these in a typical office space in any building. Specifics of putting these in each building can be done later. GBBN to determine how many are required in each building and where they may go (e.g. only in public JC bldg and maybe every other floor in 800, TBD by Architect).
01/30/17 – GBBN reports findings from the Department of Justice Technical Assistance Services. Comments related to requirements for gender neutral, civil rights, plumbing and local verses Federal Laws.
08/29/17 – GBBN completes two possible layouts and forwards to TEI for review. TEI provided review comments to GBBN and plumbing fixtures to use, Amer Std is the BOD for this project. GBBN will expand plan to section and keep working on this project.
11/30/17 – GBBN will send final layout to TEI and TEI will price up the cost to build this “inside the project scope area”. Ancillary areas not included in this estimate.
02/12/18 – GBBN completes drawing updates and entry in Archibus Project Request Estimate #1950.
GBBN – Family Restrooms – Prototype and Estimate Read More »
10/12/15 – Facilities notifies GBBN the UC Reading Road Campus option will not be pursued any further. GBBN requested to submit a new SOSS for Master Plan Services for Existing and Future Buildings”.
10/12/15 – GBBN authors and delivers SOSS to Facilities.
12/08/15 – GBBN receives call from Diana Supe about preliminary approval of SOSS.
08/17/18 – Facilities requests three (3) copies of the Master Plan Phase II printed and delivered to Facilities.
08/21/18 – Copies ordered from Phippps. Facilities confirms printing can be billed to General Services.
09/25/18 – Invoice for printing received by GBBN.
GBBN – Master Plan Services – Existing and Future Buildings Read More »
01/28/10 – Bert Watts at monthly meeting discussed need for SOSS to be submitted.
03/08/10 – GBBN began editing LEED EB+OM checklist based on 2009 LEED EB+OM manual.
03/11/10 – Energy and Atmosphere webinar held in GBBN’s Office.
03/25/10 – Material Resources Webinar held in GBBN’s Office.
03/26/10 – GBBN internal LEED EB+OM discussions. Tony Yunker to be LEED EB+OM specialist LEED AP.
03/30/10 – GBBN internal LEED EB+OM discussions on costs implications to project and design costs.
04/28/10 – SOSS to be presented to Bert Watts at monthly partnership meeting.
05/12/10 – Signed and Approved SOSS returned.
06/01/10 – Meeting with Phil Babinec, specification writer, to kick-of project.
07/27/10 – Phil Babinec is authoring first protocol and procedural document for review.
08/05/11 – Set of standard specification Table of Contents generated.
02/28/14 – Meeting with specification writer and Professional Services Group about scheduling for completion of this scope of work.
03/03/14 – Internal meeting to reacquaint specification writer on project scope and deliverables.
09/26/14 – Phil is working on these to LEED Version 4. Bert agreed.
12/07/15 – GBBN re-engages the specification authoring. A table of contents and specification master is completed.
12/23/16 – GBBN has in-house staff meeting to discuss agenda for Owner Re-kick-off Meeting.
01/06/17 – GBBN holds follow up in-house meeting to discuss and review items collected as exhibits to share with Owner in next meeting.
GBBN – LEED Specifications Read More »
01/09/15 – GBBN attends interview with Selection Committee at County Administration Building, Room #605
01/30/14 – GBBN attends monthly Partnering Meeting.
01/29/15 – GBBN is notified of their successful renewal of the Architectural Partnership.
02/20/15 – GBBN sends Exhibit B to Facilities Department for use in authoring new contract.
02/24/15 – GBBN sends Exhibit A to Facilities Department for use in authoring new contract.
03/13/15 – Final Approved Contracts received from Hamilton County. Contract initialized with Public Defender’s Office 2/3 Floor Renovation Project. No General Services SOSS requested.
05/12/15 – General Services SOSS requested by Bert Watts.
05/26/15 – SOSS hand delivered to Bert Watts.
06/25/15 – GBBN attends monthly Partnering Meeting.
07/30/14 – GBBN attends monthly Partnering Meeting.
08/27/15 – GBBN attends monthly Partnering Meeting.
09/24/15 – GBBN attends monthly Partnering Meeting. Delivered new SOSS for extension.
10/29/15 – GBBN attends monthly Partnering Meeting.
11/03/15 – GBBN delivers SOSS #F010 for 2016 General Services to Facilities.
12/07/15 – Facilities transmits approved SOSS to GBBN.
12/09/15 – GBBN attends monthly Partnering Meeting.
01/28/16 – GBBN attends monthly Partnering Meeting.
02/19/16 – GBBN and Facilities agree to terms for Construction Administration Submittal Review scope for CAB Lobby Building Security to be billed to General Services.
02/25/16 – GBBN attends monthly Partnering Meeting.
03/23/16 – Facilities inquires about potential services for the IFM/WebCentral Space Plan updates for the 800 Broadway northwest corner. GBBN sends an estimate of hours required for the services.
03/31/16 – GBBN attends monthly Partnering Meeting.
04/18/16 – GBBN reviews and approves CAB Lobby Security Millwork Submittals.
04/26/16 – GBBN performs Hamilton County Internal Contract Updates.
04/28/16 – GBBN attends monthly Partnering Meeting.
05/26/16 – GBBN attends monthly Partnering Meeting.
06/28/16 – GBBN completes website updates.
06/29/16 – GBBN attends monthly Partnering Meeting.
07/27/16 – GBBN completes website updates.
07/28/16 – GBBN attends monthly Partnering Meeting.
08/24/16 – GBBN approved for CAB Monitor Relocation services via the General Services.
08/25/16 – GBBN attends monthly Partnering Meeting.
09/29/16 – GBBN attends monthly Partnering Meeting. GBBN asked to inquire about renewel of 800 Broadway LEED EB+OM Certification verses new LEED version.
10/04/16 – GBBN responds to Facilities about the Recertification requirements for 800 Broadway after research by GBBN’s LEED specialist.
10/27/16 – GBBN attends monthly Partnering Meeting.
12/05/16 – GBBN submits SOSS for 2017 General Services.
01/07/17 – GBBN received approved SOSS.
01/17/17 – THP sends BOCC Title Sheet updates to GBBN.
01/26/17 – GBBN attends monthly Partnering Meeting.
01/30/17 – Facilites sends updated Purchase Orders for LEED Specifications and ADA Assessment (CAB) due to erroneous closing of both SOSS.
02/02/17 – Facilities sends Small Business updates to GBBN
02/16/17 – Facilities sends Green Seal Paint Information to GBBN.
02/17/17 – Facilities sends OSHA Fact Sheet to GBBN
02/23/17 – GBBN attends monthly Partnering Meeting.
03/23/17 – GBBN attends monthly Partnering Meeting.
04/24/17 – GBBN discussed with Facilities, generating renderings of 800 Broadway, for the suggested security camera installations on this project. The intent is to interface with the City of Cincinnati Historic Preservation Department for approval.
04/04/17 – GBBN participates in “History In Your Own Backyard” filming for the Alms and Doepke Building.
04/27/17 – GBBN attends monthly Partnering Meeting.
05/16/17 – GBBN emails City of Cincinnati Historic Conservator about impending Security Camera placement on front facade of building.
05/18/17 – GBBN calls City of Cincinnati Historic Conservator about impending Security Camera placement on front facade of building. A voice mail is left.
05/19/17 – City of Cincinnati Historic Conservator emails GBBN to indicated this building is not “locally registered, but is Federally Registered”. This results on no requirement for evaluation by the City of Cincinnati, only Federally but only if Federal Funding is used for the project. GBBN reports findings to Facilities.
05/25/17 – GBBN attends monthly Partnering Meeting.
06/08/17 – GBBN attends meeting at Courthouse, Room #115 to discuss potential Reconfiguration of southern space in office. Facilities determines this can be handled through State Term contracting in lieu of a new SOSS.
06/29/17 – GBBN attends monthly Partnering Meeting.
07/18/17 – GBBN attends City of Cincinnati Buildings and Inspections seminar on Accessibility. Discussed changes with Facilities as an update to the Accessibilities Assessments.
07/27/17 – GBBN attends monthly Partnering Meeting and completes Website Updates.
08/31/17 – GBBN attends monthly Partnering Meeting and completes Website Updates.
09/25/17 – GBBN attends monthly Partnering Meeting and completes Website Updates.
10/26/17 – GBBN attends monthly Partnering Meeting and completes Website Updates.
11/30/17 – GBBN attends monthly Partnering Meeting and completes Website Updates.
01/25/18- – GBBN attends monthly Partnering Meeting and completes Website Updates. After Partnering Meeting a separate meeting for the new Website Software was held.
02/21/18 – GBBN updates Website using new software.
02/22/18 – GBBN attends monthly Partnering Meeting.
03/22/18 – Facilities authorizes GBBN to author a Gantt Chart for Administration showing the entire anticipated project Schedule for the HCJC Recovery Unit Build-Out.
03/23/18 – GBBN sends Gantt Chart to Administration for review.
03/26/18- GBBN attends Justice Center Space Augmentation Project Meeting.
03/29/18 – GBBN attends monthly Partnering Meeting and completes Website Updates. After Partnering Meeting a separate meeting for the new Website Software was held.
04/23/18 – Facilities determined Justice Center State Grant Budget and Schedule Analysis would be separate SOSS and not part of General Services.
05/31/18 – GBBN attends monthly Partnering Meeting.
06/28/18 – GBBN attends monthly Partnering Meeting.
07/26/18 – GBBN attends monthly Partnering Meeting and completes website updates.
08/29/18 – GBBN completes updates to Website.
08/30/18 – GBBN attends monthly Partnering Meeting.
08/17/18 – Facilities requests three (3) copies of the Master Plan Phase II printed and delivered to Facilities.
08/21/18 – Copies ordered from Phippps. Facilities confirms printing can be billed to General Services.
09/25/18 – Invoice for printing received by GBBN.
09/27/18 – GBBN attends monthly Partnering Meeting.
10/25/18 – GBBN attends monthly Partnering Meeting.
11/29/18 – GBBN attends monthly Partnering Meeting.
01/03/19 – Facilites confirms CH Room #205 Permit Reimbursable Expense may be billed to this General Services SOSS.
01/31/19 – GBBN attends monthly Partnering Meeting.
02/28/19 – Monthly Partnering Meeting moved to tomorrow due to conflicts.
03/01/19 – GBBN attends monthly Partnering Meeting.
03/28/19 – GBBN attends monthly Partnering Meeting.
04/25/19 – GBBN attends monthly Partnering Meeting.
05/30/19 – GBBN attends monthly Partnering Meeting.
06/27/19 – GBBN attends monthly Partnering Meeting.
07/22/19 – Facilities agrees to invoice #F072 CAB 10th Floor Conference Room Community Developmenmt project, with unapproved SOSS. to General Services.
07/25/19 – GBBN attends monthly Partnering Meeting.
08/29/19 – GBBN completes website updates and GBBN attends monthly Partnering Meeting.
09/26/19 – GBBN completes website updates and GBBN attends monthly Partnering Meeting.
10/31/19 – GBBN completes website updates and GBBN attends monthly Partnering Meeting.
12/12/19 – GBBN completes website updates and GBBN attends monthly Partnering Meeting.
01/30/20 – GBBN completes website updates and GBBN attends monthly Partnering Meeting.
01/31/20 – Facilities confirms GBBN can discontinue attending any future Partnering Meetings after the March meeting.
02/27/20 – GBBN completes website updates and GBBN attends monthly Partnering Meeting.
03/26/20 – GBBN completes website updates. The regular Partnering Meeting is cancelled due to COVID-19 and State of Ohio shutdown.
GBBN – General Services Read More »